Statistics: Graph does not start at zero

Description

Steps to reproduce

  1. In an account with significant traffic to posted works, navigate to the Statistics page

  2. Sort by a metric that has a significant value - word count is the most controllable

What happens

  • In situations where a work has a significant value, the baseline for the graph will be a non-zero number, proportional to the maximum values of the first- and fifth-place works.

What should happen

  • The baseline of the graph should be at zero.

Environment

None

Status

Assignee

gbhsrspm

Reporter

CJ Record

Roadmap

Misc

Priority

Low

Affects versions

Fix versions

None

Components

FrontEnd

Difficulty

Medium

Required Access Level

None

Milestone

Internal 0.9
Configure